Included
Commissioning and safety checklist
Load-managed
Smart EV charger installation with load management, protection upgrades, and practical daily-use setup guidance.
SaveHome charging should be safe, tariff-aware, and compatible with your supply—not just a box on the wall. We verify load capacity, install protected circuits, commission smart scheduling, and guide you through grant documentation where applicable.
Phase 1
Supply suitability and placement review
Phase 2
Installation and protection upgrades
Phase 3
App setup and charging profile handover
Commissioning and safety checklist
Usage and tariff optimization tips
Warranty and support documentation
Most homes use 7 kW single-phase chargers. Higher ratings depend on supply headroom—we confirm before ordering hardware.
Share a few site-specific details and our engineers will respond with a clear plan, timeline, and quote path.